Index 01 / Cost Guide 2026
What things
actually cost.
Real ranges from real Huntington Beach jobs. No teaser prices. No hidden markups. The honest version of what your project will cost in 2026 — and what you get for the money.
Every range below reflects actual JVB project pricing from the last twelve months — not industry averages.
Final pricing is always provided as a written, line-item estimate after a free in-home consultation.
No subcontractor markup-on-markup. The price you see is the price you pay — fixed, in writing.
Remodeling
Kitchen Remodel
From cosmetic refresh to custom gut renovation
- Cosmetic refresh 2–3 weeks
Same layout, refaced or repainted cabinets, mid-range quartz, new tile backsplash, faucet, lighting
$15K – $25K - Mid-range remodel 5–7 weeks
New semi-custom cabinetry, premium quartz, full backsplash, recessed lighting, 1–2 new appliances, light layout changes
$35K – $65K - Custom gut 8–14 weeks
Custom cabinetry, slab counters, professional appliances, structural changes, full electrical & plumbing rework
$80K – $180K+
Remodeling
Bathroom Remodel
Powder rooms to spa primary baths
- Powder room 1–2 weeks
Toilet, vanity, faucet, lighting, paint, basic tile floor
$8K – $15K - Mid-range bath 3–5 weeks
New tub or shower, vanity, toilet, tile floor and surround, lighting, paint, ventilation
$18K – $38K - Spa primary 5–8 weeks
Walk-in shower with frameless glass, freestanding tub, double vanity, heated floors, custom tile, smart fixtures
$45K – $85K+
Flooring
Flooring Installation
Per square foot — material + installation
- Luxury vinyl plank 1–3 days per room
COREtec, Karndean, or Shaw Floorte over leveled subfloor with click-lock or glue-down install
$6 – $12 / sqft - Engineered hardwood 3–5 days per room
White oak, walnut, or hickory glue-down or floating install over moisture-tested subfloor
$10 – $18 / sqft - Solid hardwood 5–8 days per room
Solid white oak or walnut nail-down with on-site sanding and three coats of polyurethane finish
$14 – $24 / sqft - Porcelain tile 4–7 days per room
Large-format porcelain or ceramic over level subfloor with thinset, leveling clips, and color-matched grout
$11 – $22 / sqft
Electrical
Electrical Work
Circuit work, panels, lighting, EV
- Outlet or switch Same day
New outlet, GFCI, USB receptacle, or smart switch run from existing circuit
$185 – $385 each - Recessed light pkg 2–3 days
6–12 LED recessed lights on a new dimmer circuit, drywall patched and painted
$2.5K – $6K - EV charger install 1 day
Level 2 EV charger on a dedicated 50A circuit, 30–50ft conduit run
$1.4K – $3.2K - 200A panel upgrade 1–2 days
New main panel, surge protection, meter swap, code-compliant grounding, drywall restoration
$3.8K – $5.8K - Whole-house rewire 2–4 weeks
New Romex throughout, dedicated circuits per room, panel upgrade, drywall patch and finish
$14K – $32K
Finishing
Plumbing, Drywall, Painting
Trade-by-trade pricing
- Faucet or fixture install Same day
New kitchen or bath faucet, garbage disposal, or supply valve replacement
$240 – $580 - Whole-house PEX repipe 4–6 days
Galvanized to PEX or copper repipe, all supply lines, drywall patching included
$8K – $18K - Drywall — per room 3–5 days
New drywall hang, three-coat finish, texture matching, ready for paint
$1.4K – $3.5K - Interior paint — full home 5–8 days
Walls and ceilings, two coats premium latex, prep and minor patching included (avg 2,000 sqft home)
$5.8K – $14K - Exterior paint — coastal 7–10 days
Pressure wash, prep, prime bare areas, two coats marine-grade acrylic on body and trim (avg 2,000 sqft)
$11K – $22K
Index 07 / How We Quote
A real estimate
in three steps.
In-home consultation
Javier visits your home, measures the space, asks what you're trying to accomplish, and identifies anything that could complicate the scope. Free, no pressure, typically scheduled within the week.
Written line-item estimate
Within 48 hours we deliver a fixed-price proposal that itemizes every trade, every material, and every contingency. No "TBD" lines, no time-and-materials gotchas.
Approve and schedule
If the estimate works, we sign a contract, pull permits if needed, and lock in a start date. From there your project is on the same in-house schedule — one foreman, one team.